Solar45: Why the Value in Solar Sits Before the Panels Go In

A look at the strategy behind Solar45, and why early-stage development with storage built in is where the work now happens.

A completed solar farm is, in most respects, a commodity. The panels come from a handful of manufacturers, the engineering is well understood after two decades of deployment, and the sunlight is free to everyone standing in the same field. What is not a commodity is everything that had to happen before the first panel went in. Planning consent. A grid connection agreement. A site that sits where the network can actually take the power. Those are scarce, they take years, and most of them never arrive.

That gap is the strategy behind Solar45, one of the renewable energy projects Univere introduces to qualifying investors. The focus is early-stage solar in Portugal, advanced through development toward Ready to Build status, with battery storage integrated into the design rather than added later.

Generation is the easy part now. Permission, connection and position are the scarce ones.

Why early stage rather than operating assets

An operating solar farm is a known quantity. It has a production record, a revenue history, and a price that reflects all of it. Buyers of operating assets compete against pension funds and infrastructure managers with a lower cost of capital, which compresses what is left for anyone arriving late. The competition is intense precisely because the uncertainty has already been removed.

Development-stage assets sit at the other end. The uncertainty is real and so is the work required to remove it. A site has to be assessed, secured, taken through planning, and connected to a grid that in much of Europe is already full. Each milestone cleared changes what the asset is worth, because it moves the project closer to the point where institutional capital will underwrite it. The value is created by the process, not by the weather.

We set out why grid access rather than sunshine now sets the price of renewable capital in the renewable energy cost of capital.

Why Portugal

Portugal combines three things that rarely appear together. The resource is among the strongest in Europe, with irradiance well above northern markets. The regulatory framework has been built steadily since the early 2000s and carried across governments of different parties. And the country has already proved the economics at auction, contracting solar at some of the lowest prices ever recorded anywhere.

The fuller case for why the centre of European solar economics moved south is in why Iberia now leads European solar energy investment, and the land-use side of the same story is covered in low productivity land becoming valuable for solar in Portugal.

Why storage is part of the design, not an addition

A solar asset that can only sell power at the moment it generates is exposed to the one hour when everyone else is generating too. In markets with heavy solar build out, midday prices fall hard and at times turn negative. Storage moves that energy through time, so the asset can sell into the evening when demand and prices rise, and earn from the balancing services the grid needs.

Designing that in from the start matters more than it sounds. A battery placed at a solar connection that already exists avoids most of the queue and most of the cost that a standalone battery carries. Retrofitting later means rejoining a line that runs for years in several markets. The argument in full is in solar and storage, the new default.

What Ready to Build actually means

Ready to Build is the point at which a project has everything it needs to start construction. Consents in place, grid connection secured, land rights settled, and the commercial arrangements documented. It is the milestone at which the buyer pool changes, because institutional capital that will not underwrite planning risk will underwrite a permitted, connected asset.

The Solar45 approach targets that transition. Capital enters while the development work is still being done and the strategy is oriented toward the point where the project is positioned for institutional exit. None of that is guaranteed. Projects can stall in planning, grid offers can be delayed or refused, and timelines slip routinely across the sector.

The honest reading

Early-stage development carries real risk, and it is a different risk from the one an operating asset carries. Planning can be refused. A grid connection can arrive late or not at all. Capital committed to this stage is at risk for the full term, and asset backing, where it applies, does not guarantee the return of that capital.

What the stage offers in exchange is a position taken before the uncertainty has been priced out by everyone else. Whether that trade suits any particular portfolio depends on the horizon, the liquidity the investor needs, and how the position sits against everything else they hold. We look at how those questions are weighed in the portfolio logic of uncorrelated real assets.

Univere introduces and distributes access to products created and structured by trusted third parties. It does not manage the underlying assets, and the appointed fund manager remains accountable for the operation of each project. Full product terms and offering materials are available to certified and self-certified investors following the qualification step.

 

UNIVERE INVESTMENT SOLUTIONS  |  Access. Without the Noise.

Professional access only. Not for public or retail audiences. Univere Investment Solutions Limited is not authorised or regulated by the Financial Conduct Authority, and communicates this content in reliance on the relevant financial promotion exemptions under FSMA 2000. This content does not constitute financial advice or a personal recommendation. Capital is at risk. Investments may be illiquid and difficult to realise. Past performance is not indicative of future results. Prospective investors should seek independent financial and legal advice before making any investment decision.

More Insights